Tayler Realty Boone County Missouri Tayler Realty Boone County Missouri Tayler Realty Boone County Missouri  
Tayler Realty Boone County Missouri Tayler Realty Boone County Missouri Tayler Realty Boone County Missouri  
search listings
featured homes
exclusive listings
meet our agents
tayler realty
columbia, mo
hallsville, mo
centralia, mo
buying a home
selling a home
calculators
building a home
relocating
contact us
home

All Construction Articles | Back to Previous Page
Top 10 Design Elements | Define Your Objectives | Choosing a Builder | Construction Contracts | Selecting Land | Building Permits | Construction Process | Construction Financing | Construction Cost Over-Run |

Building Permits

Contact your local government and speak to the official responsible for building permits about what will be required. Large builders do this for you, while not every custom builder does.

Procedures and requirements vary, but there are some common requirements:

  • Permit application
  • Site plan showing the house, easement and setbacks
  • House plan
  • Soil report
  • Foundation plans (stamped by an engineer)
  • Water and sewer statement (for septic, percolation test results and for a well, the well permit).

There may also be various fees, which can be expensive, associated with your permit, such as permit fees, tap fees and impact fees. Tap fees are for access to your local water and sewer system. Impact fees may be applied if it is determined that your home will require an increase in local services or significant changes in infrastructure.





Missouri Real Estate Directory
573.696.0770 Phone
573.696.0771 Fax
Copyright © 2006 Tayler Realty, LLC
545 North Route B
Hallsville, MO 65255
Email: homes@taylerrealty.com
Online: www.TaylerRealty.com
 
Admin Exclusive